Robert

/Robert Abbott

About Robert Abbott

This author has not yet filled in any details.
So far Robert Abbott has created 17 blog entries.

POTUS TFR November 21 – 26

By | 2017-11-17T16:26:07+00:00 November 15th, 2017|Important Notifications|

A Presidential TFR has been issued for our area from Tuesday, November 21, 2017 at 1815 local to Sunday, November 26, 2017 at 1900 local. The Boca Raton Airport is located within the 30 NM outer ring of this TFR. Aircraft operations within this 30 NM outer ring are limited to arriving and departing traffic [...]

EMAS Construction – Airport Closure Schedule

By | 2017-09-20T16:16:52+00:00 September 20th, 2017|Important Notifications|

Airport Notice EMAS Construction Project As we finish up the second phase of the EMAS construction project, the runway and taxiways will be closed nightly between the hours of 9:00 PM and 7:00 AM, beginning Wednesday night September 27, through Friday morning September 29. As always please check NOTAMs for the most up to date [...]

Airport Status – Operations Normal

By | 2017-09-20T03:09:44+00:00 September 15th, 2017|Important Notifications, News|

Power has now been restored to all areas of the airport, and airport operations are now back to normal. Thank you for your patience as we worked to get all areas of the airport back up and running after Hurricane Irma. If you have any questions, please contact Airport Operations at 561-391-2202.   […]

Hurricane Irma – Airport Status 09-12-17

By | 2017-09-20T03:09:44+00:00 September 12th, 2017|Important Notifications, News|

Both the Airport and the Air Traffic Control Tower are OPEN. Atlantic Aviation is open and has resumed normal operations. Signature Flight Support is open until 5:00 PM today, and will reopen for normal operations on Wednesday, September 13th at 6:00 AM Please be sure to contact the FBOs for more information on service availability. Please [...]

Hurricane Irma – Airport Status 09-12-17

By | 2017-09-20T03:09:44+00:00 September 12th, 2017|Important Notifications, News|

Both the Airport and the Air Traffic Control Tower are OPEN. The FBOs – Atlantic Aviation and Signature Flight Support – are closed. Please contact the FBOs for more information on service availability. Please check NOTAMs for the latest airport condition information.  If you have any questions, please contact Airport Operations at 561-391-2202 […]

Hurricane Irma – Airport Closure Information

By | 2017-09-20T03:09:44+00:00 September 8th, 2017|Important Notifications, News|

As Hurricane Irma’s forecasted track continues to shift closer to the Boca Raton area, the Airport is now under a Hurricane Watch.  Tropical storm force winds are expected to arrive overnight Friday and into Saturday morning, with hurricane force winds possible by Sunday morning.  It is recommended that all aircraft be relocated or secured by Friday afternoon. To assist with the evacuation of [...]

BCT PROCEDURES – Hurricane Irma – Update

By | 2017-09-20T03:09:44+00:00 September 6th, 2017|Important Notifications, News|

As Hurricane Irma’s forecasted track continues to shift closer to the Boca Raton area, it is important to begin taking the proper precautions to secure all leaseholds, hangars, and aircraft. Tropical storm force winds are expected to arrive overnight Friday and into Saturday morning, with hurricane force winds possible by Sunday morning. It is expected that the Boca Raton Airport will [...]

BCT PROCEDURES – Hurricane Irma

By | 2017-09-20T03:09:44+00:00 September 5th, 2017|Important Notifications, News|

Hurricane Irma is expected to impact the South Florida area this upcoming weekend, with tropical storm forced winds expected to begin as early as Friday. While the exact location of landfall is unknown, extremely high winds, heavy thunderstorms, and rain can be expected throughout the area. Boca Raton Airport users and tenants should take this [...]

EMAS Construction – Airport Closure Schedule Update for Labor Day

By | 2017-09-20T03:09:44+00:00 August 29th, 2017|Important Notifications|

Airport Notice EMAS Construction Project Closure Schedule for Labor Day  Due to the upcoming Labor Day holiday, construction will be cancelled for Sunday night, September 3rd. The airport will remain open from Friday, September 1st at 7:00 AM until Monday, September 4th at 9:00 PM, when the normal closure schedule will resume. Please remember to [...]

POTUS TFR
X