Robert

/Robert Abbott

About Robert Abbott

This author has not yet filled in any details.
So far Robert Abbott has created 39 blog entries.

BCT PROCEDURES – Hurricane Irma

By |2017-09-20T03:09:44-04:00September 5th, 2017|Important Notifications, News|

Hurricane Irma is expected to impact the South Florida area this upcoming weekend, with tropical storm forced winds expected to begin as early as Friday. While the exact location of landfall is unknown, extremely high winds, heavy thunderstorms, and rain can be expected throughout the area. Boca Raton Airport users and tenants should take this [...]

EMAS Construction – Airport Closure Schedule Update for Labor Day

By |2017-09-20T03:09:44-04:00August 29th, 2017|Important Notifications|

Airport Notice EMAS Construction Project Closure Schedule for Labor Day  Due to the upcoming Labor Day holiday, construction will be cancelled for Sunday night, September 3rd. The airport will remain open from Friday, September 1st at 7:00 AM until Monday, September 4th at 9:00 PM, when the normal closure schedule will resume. Please remember to [...]

Customs Project – Ramp Closure Between P6 and P7

By |2017-09-20T03:09:48-04:00May 8th, 2017|Important Notifications|

Airport Notice Customs Construction Project The next phase of the Boca Raton Airport Customs and Border Protection construction project will begin on April 23rd, 2017. During this time the ramp between taxiways P6 and P7 will be closed. No vehicle or pedestrian traffic will be permitted on this section of the ramp for the duration [...]

EMAS Construction – Airport Closure Schedule

By |2017-09-20T03:09:48-04:00May 8th, 2017|Important Notifications|

Airport Notice EMAS Construction Project The first phase of the Boca Raton Airport Runway 23 Departure End Engineered Materials Arresting System (EMAS) is scheduled to begin on April 23rd, 2017 and run through early September 2017. During this time the Runway and Taxiways will be closed daily between the hours of 9p.m. and 7a.m. Sunday [...]

POTUS TFR – April 13 – 16, 2017

By |2017-09-20T03:09:48-04:00April 10th, 2017|Important Notifications|

A Presidential TFR has been issued for our area from Thursday, April 13th, 2017 at 18:30 local to Sunday, April 16th, 2017 at 16:30 local. The Boca Raton Airport is located within the 30 NM outer ring of this TFR. Aircraft operations within this 30 NM outer ring are limited to arriving and departing traffic. [...]

POTUS TFR – April 6 – 9, 2017

By |2017-09-20T03:09:48-04:00March 30th, 2017|Important Notifications|

A Presidential TFR has been issued for our area from Thursday, April 6th, 2017 at 14:00 local to Sunday, April 9th, 2017 at 22:30 local. The Boca Raton Airport is located within the 30 NM outer ring of this TFR. Aircraft operations within this 30 NM outer ring are limited to arriving and departing traffic. [...]

POTUS TFR – March 17-19, 2017

By |2017-09-20T03:09:48-04:00March 14th, 2017|Important Notifications|

A Presidential TFR has been issued for our area from Friday, March 17th , 2017 at 1800 local to Sunday, March 19th, 2017 at 2230 local. The Boca Raton Airport is located within the 30 NM outer ring of this TFR. Aircraft operations within this 30 NM outer ring are limited to arriving and departing [...]

X