Improvements

Airport Road Improvements

Budget

$80% FDOT – 20% BRAA

Timeline

2004-2026 

Contractor

Ranger Construction Industries, Inc.

Status

Completed

This project involved the resurfacing of Airport Rd. pavements, installation of bike lanes and pedestrian sidewalk improvement, undergrounding of utilities to enhance reliability, installation of native landscaping, and the beautification of tenant entrances. Also included in this project were various drainage and storm-water system upgrades to enhance reliability in heavy rain events. Funding for this project was provided by FDOT grants at an 80% level with BRAA providing the remaining 20%.

Contractor

Shiff Construction & Development Inc

Size/Scope

Structural Modifications, Interior Systems, Technology Upgrades, Environmental & HVAC.

Materials/Systems

Data Management Tools, Electrification Infrastructure, Lighting Upgrades.

Impact

Expands the building’s functionality to host large-scale monthly BRAA meetings, eliminating the need for the Authority to rent outside space and improving transparency for the public.