Electrical Vault and Airport Beacon Relocation

Start Date

FY2025

Estimated Completion Date

TBD

Status

Active

This project includes the analysis, design, and construction required to relocate the electrical vault and Airport beacon, including potential integration with the ATCT.

Conduct a siting analysis for relocation options.
Complete preliminary engineering and design plans.
Relocate electrical vault equipment to the ATCT, if feasible.

Relocate the Airport beacon to the top of the ATCT.

Evaluate feasibility of housing equipment within the ATCT.

Design and construct a standalone electrical vault, if required.

Complete all associated construction and infrastructure improvements.