This project consists of geometry updates to Taxiways P2, P3 and P9 to align with the current FAA Advisory Circular standards, as the current configuration no longer meets those guidelines. Additionally, this project rehabilitates the Runway 5 Aircraft Holding Bay.
Taxiway Geometry Improvements and Runway 5 Aircraft Holding BayDavid Rodriguez2026-08-03T17:36:37-04:00
