Return to Capital Projects Dashboard

Taxiway Geometry Improvements and Runway 5 Aircraft Holding Bay

Start Date

Summer 2026

Estimated Completion Date

TBD

Status

Active

This project consists of geometry updates to Taxiways P2, P3 and P9 to align with the current FAA Advisory Circular standards, as the current configuration no longer meets those guidelines. Additionally, this project rehabilitates the Runway 5 Aircraft Holding Bay.

The pavement of the Taxiways and Runway 5 Aircraft Holding Bay will be milled and overlayed to preserve the integrity of the existing pavement limits.
The electrical infrastructure in the Taxiway areas will be updated to reflect the revised geometry.
More Details