This project involved widening Taxiways P10, P9, C and P5 between Taxiway P and the ramps to meet the required FAA Taxiway Edge Safety Margins in Advisory Circular 150/5300-13A for the largest aircraft currently using the Boca Raton Airport. This project also entailed the replacement of existing PAPI (Precision Approach Path Indicator) lights with LED equipment.
